Adriatic Lng, the Edison, Exxon and Qatar Petroleum joint venture which owns the Rovigo Lng terminal, has made two slots available on a spot basis for Aug. 5-7 and Aug. 21-23 with deadlines for requests respectively of July 27 and Aug. 12; another two slots are to be granted on a monthly basis for Sept. 7-9 and Sept. 18-21 with access requests to b ...
© All rights reserved