With resolution 43/2013/R/eel, published last Monday, the Energy Authority has granted an added remuneration of 2% to two of Terna's pilot projects for storage of 16 MW of power as per the Defense Plan that the grid operator elaborated for Sicily and Sardinia. These are power intensive storage systems for a maximum of 8 MW each, as foreseen by the ...
© All rights reserved